- Foundation notes
- The City guide requires omitted site-specific foundation details and a State/HCD Design Approval Agency stamp for applicable factory-built plans; local site review remains required.
- Utility notes
- Site-specific utility routing and connection review remains required. New detached ADUs may require separate connections and proportional connection or capacity charges under current City code.
- Energy notes
- The City guide requires applicable Title 24 energy documentation and CALGreen information during plan pre-approval; project-specific compliance remains subject to City review.
- Accessibility notes
- Not listed in source
- Permit fee notes
- The adopted 2026–27 City schedule lists $1,455.43 for eligible manufactured, prefab, or pre-approved ADU review. Other site, utility, impact, professional, and construction charges may apply.
- Cost notes
- Provider-submitted City-gallery range described as covering a finished home, foundation, permits, plans, site plan, Title 24, project management, material, labor, appliances, and other listed items; verify asterisked exclusions.
- Additional notes
- City gallery catalog record a0APk00000G14rZMAR. The City-specific gallery lists the design as State of California (HCD)-certified, but it is not in the gallery's locally confirmed-plan-ID list. The controlled approval_status 'preapproved' records the external agency certification plus City listing; it is not parcel or building-permit approval. Phase 2 City site-specific review remains required, and the streamlined path does not allow design modifications. The direct document URL is a floor-plan image, not a complete permit-ready plan set. Provider-submitted gallery features: All-electric;In-unit washer/dryer;WUI (wildland urban interface) compliant;Solar-ready. No explicit public statement established that the plan license is free; plan_fee remains NULL.