- Foundation notes
- The City guide requires omitted site-specific foundation details and HUD or HUD-approved Production Inspection Primary Inspection Agency evidence; otherwise a California-licensed engineer must prepare the foundation design.
- Utility notes
- Site-specific utility routing and connection review remains required. New detached ADUs may require separate connections and proportional connection or capacity charges under current City code.
- Energy notes
- The City guide requires applicable Title 24 energy documentation and CALGreen information during plan pre-approval; project-specific compliance remains subject to City review.
- Accessibility notes
- Not listed in source
- Permit fee notes
- The adopted 2026–27 City schedule lists $1,455.43 for eligible manufactured, prefab, or pre-approved ADU review. Other site, utility, impact, professional, and construction charges may apply. Because the listed area exceeds 750 square feet, proportional development impact fees may apply under current City code.
- Cost notes
- Provider-submitted City-gallery range. Low end is home only; high end adds typical options, setup, delivery, foundation, close-up, steps, and landings. Permits, mitigation fees, and utilities are excluded.
- Additional notes
- City gallery catalog record a0APk000009WZlRMAW. The City-specific gallery lists the design as Federal Government (HUD)-certified, but it is not in the gallery's locally confirmed-plan-ID list. The controlled approval_status 'preapproved' records the external agency certification plus City listing; it is not parcel or building-permit approval. Phase 2 City site-specific review remains required, and the streamlined path does not allow design modifications. The direct document URL is a floor-plan image, not a complete permit-ready plan set. Provider-submitted gallery features: WUI (wildland urban interface) compliant;Turnkey project. Bathrooms source value '2+' is a range/open-ended value and was preserved here rather than forced into the scalar column. No explicit public statement established that the plan license is free; plan_fee remains NULL.