- Foundation notes
- The City guide requires omitted site-specific foundation details and HUD or HUD-approved Production Inspection Primary Inspection Agency evidence; otherwise a California-licensed engineer must prepare the foundation design.
- Utility notes
- Site-specific utility routing and connection review remains required. New detached ADUs may require separate connections and proportional connection or capacity charges under current City code.
- Energy notes
- The City guide requires applicable Title 24 energy documentation and CALGreen information during plan pre-approval; project-specific compliance remains subject to City review.
- Accessibility notes
- Not listed in source
- Permit fee notes
- The adopted 2026–27 City schedule lists $1,455.43 for eligible manufactured, prefab, or pre-approved ADU review. Other site, utility, impact, professional, and construction charges may apply.
- Cost notes
- Provider-submitted City-gallery range. Home-only pricing starts near $84,000–$107,000; the upper estimate adds typical options, setup, delivery, foundation, close-up, steps, and landings. Permits, mitigation fees, and utilities are excluded.
- Additional notes
- City gallery catalog record a0APk000008hiE6MAI. The City-specific gallery lists the design as Federal Government (HUD)-certified, but it is not in the gallery's locally confirmed-plan-ID list. The controlled approval_status 'preapproved' records the external agency certification plus City listing; it is not parcel or building-permit approval. Phase 2 City site-specific review remains required, and the streamlined path does not allow design modifications. The direct document URL is a floor-plan image, not a complete permit-ready plan set. Provider-submitted gallery features: In-unit washer/dryer;WUI (wildland urban interface) compliant;Turnkey project. Repeated whitespace in the displayed plan name was normalized without changing its words. No explicit public statement established that the plan license is free; plan_fee remains NULL.