- Foundation notes
- The City guide requires omitted site-specific foundation details and a State/HCD Design Approval Agency stamp for applicable factory-built plans; local site review remains required.
- Utility notes
- Site-specific utility routing and connection review remains required. New detached ADUs may require separate connections and proportional connection or capacity charges under current City code.
- Energy notes
- The City guide requires applicable Title 24 energy documentation and CALGreen information during plan pre-approval; project-specific compliance remains subject to City review.
- Accessibility notes
- The provider marks 'Accessibility features' in the City gallery. No independent accessibility-code compliance conclusion was inferred.
- Permit fee notes
- The adopted 2026–27 City schedule lists $1,455.43 for eligible manufactured, prefab, or pre-approved ADU review. Other site, utility, impact, professional, and construction charges may apply.
- Cost notes
- Provider-submitted City-gallery estimate. The $228,800 base is described as including unit, delivery, permitting, and standard site work; listed customizations add $1,000–$17,500.
- Additional notes
- City gallery catalog record a0AHp000014OmjBMAS. The City-specific gallery lists the design as State of California (HCD)-certified, but it is not in the gallery's locally confirmed-plan-ID list. The controlled approval_status 'preapproved' records the external agency certification plus City listing; it is not parcel or building-permit approval. Phase 2 City site-specific review remains required, and the streamlined path does not allow design modifications. The direct document URL is a floor-plan image, not a complete permit-ready plan set. Provider-submitted gallery features: All-electric;In-unit washer/dryer;WUI (wildland urban interface) compliant;Solar-ready;Accessibility features;Turnkey project. No explicit public statement established that the plan license is free; plan_fee remains NULL.