Summary
- Location
- San Diego, San Diego County, California, USA
- Accepted plans
- 26 accepted plans
- Providers
- 4 providers
- Origin programs
- 3 programs
- Plan size range
- 224 to 1,200 sq ft
- Permit sources
- 6 sources
City program
Browse official and accepted pre-approved ADU plans for San Diego, California. Compare plan size, bedrooms, providers, approval status, official source links, permit requirements, and fees.
This San Diego page summarizes source-backed pre-approved ADU plan listings for San Diego, California, using official records tied to City of San Diego, City of Encinitas, City of Chula Vista Development Services Department, and others. The current export lists 26 accepted plans from 4 providers; provider names include DZN Partners, SnapADU, Design Path Studio, and others. Accepted listings include plans that originate from Encinitas, San Diego County, California, USA, Chula Vista, San Diego County, California, USA, and San Diego County, California, USA, so verify whether cross-jurisdiction acceptance is still current. Plan records cover 224 to 1,200 sq ft and studio to 3 bedrooms where those fields were listed by the source.
Permit and fee context is kept separate from plan acceptance. The data export includes 14 permit requirement records and 2 fee records for San Diego. Permit requirement records include Accepted preapproved plan programs, Preapproved plan review timing, and others. Fee records include San Diego ADU fees and San Diego master plan mapping fee. When a source did not publish a value, the page keeps that field as Not listed in source instead of filling a blank.
Use these listings as a starting point for matching a plan to a property. Source links, checked dates, acceptance notes, and provider records are shown so you can verify whether a plan remains accepted locally, what site-specific review remains, and whether local fees, plan licensing, or provider terms apply. A listing in this directory does not guarantee permit approval for a specific parcel.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
Verify current acceptance, site limits, and permit requirements with the local building department.
All
County of San Diego Standard ADU Plans; City of Chula Vista Standard ADU Plans; City of Encinitas Permit-Ready ADU Plans.
All
Applications that utilize preapproved plans are subject to a 30-day review and must comply with SDMC development regulations.
All
A Building Permit is required to create an ADU or JADU; there are no exemptions.
All
Site/Vicinity Plan, Floor/Roof Plans, Elevations/Sections, Structural plans/details, structural or truss calculations, Title 24 energy calculations, and listed forms including DS-3032, DS-16, and DS-560.
All
Property owner not required to live on-site for an ADU.
Junior ADU
Owner required to live on-site unless the JADU has separate sanitation facilities or owner is a government agency, land trust, or qualified housing organization.
All
Maximum 1,200 sq ft for ADUs, except conversions from existing accessory/primary structures are not subject to the 1,200 sq ft maximum.
Junior ADU
JADUs must be 150-500 sq ft.
All
No ADU parking required outside the Coastal Overlay Zone; Coastal Overlay Zone and Beach Impact Area exceptions apply. JADUs require no parking.
All
ADU conversion/interior alterations use existing setbacks; additions/new detached ADUs use zone front yard, street side yard zone or 4 ft lesser, and side/rear may encroach to property line except CBC/fire/height limits and listed conditions.
All
ADU sprinklers are not required if not required for the primary dwelling; required if the primary has sprinklers. Affordable/Bonus ADUs require sprinklers per CBC.
Detached
New constructed detached non-manufactured ADUs require solar PV per California Energy Code; existing space/additions/detached conversions do not.
All
ADUs may not be leased for less than 31 consecutive days; JADUs must be rented for more than 30 days and no STRO.
All
ADU master plan establishment requires stamped structural plans, exterior elevations/sections, and stamped structural calculations; master plans expire with new CBC or other state-mandated regulations.
All
Information Bulletin 400 refers applicants to Information Bulletin 501 and the Fees page; ADUs/JADUs are subject to school fees and other listed fees depending on project details.
All
$12.16 mapping fee listed in IB-114a; ADU establishment master plan fee is referred to IB-501.
Yes. The current San Diego, California page lists 26 accepted plans from 4 providers in the source-backed export.
The listed San Diego plan records range from 224 to 1,200 sq ft. Use the individual plan cards to confirm bedrooms, bathrooms, plan documents, and provider details because some fields are not listed by every official source.
They are tied to 6 official sources in this page's source set, including City of San Diego, City of Encinitas, and City of Chula Vista Development Services Department. Each plan, fee, and permit note should still be checked against the linked official source before use.
This page includes plans accepted for San Diego that originated in Encinitas, Chula Vista, and San Diego County. That does not mean every San Diego County or nearby city plan applies in San Diego; rely on the accepted-plan record and official source link for each listing.
No. A source-backed accepted plan can reduce plan review work, but San Diego can still require site-specific review, zoning checks, fees, utility coordination, and current code compliance. This page lists 14 permit requirements to help flag items to verify with the local building department.
This page includes 2 fee records and 14 permit requirements for San Diego. These are source-backed summaries, not a final permit quote or approval checklist.