- Origin program
- Cathedral City, Riverside County, California, USA
- Source
- Cathedral City ADU / pre-approved-plan information
- Last checked
- Aug 13, 2026
Plan record
Plan 3
Plan 3 is a standard detached ADU plan from City of Cathedral City. The public source lists it as 1,000 sq ft, 2 beds, and 2 baths. It originated in the Cathedral City, Riverside County, California, USA program. This directory currently shows acceptance in Cathedral City, Riverside County, California, USA. Source context comes from City of Cathedral City, last checked Aug 13, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.
Source-backed summary
What public sources list
Plan 3 is a standard detached ADU plan from City of Cathedral City. The public source lists it as 1,000 sq ft, 2 beds, and 2 baths. It originated in the Cathedral City, Riverside County, California, USA program. This directory currently shows acceptance in Cathedral City, Riverside County, California, USA. Source context comes from City of Cathedral City, last checked Aug 13, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.
- Provider record
- City of Cathedral City
- Origin program
- Cathedral City, Riverside County, California, USA
- Accepted location pages
Details
Plan facts
- Plan identifier
- Plan 3
- Provider
- City of Cathedral City
- Origin location
- Cathedral City, Riverside County, California, USA
- Accepted locations
- Status
- Standard plan
- Size
- 1,000 sq ft
- Bedrooms
- 2 beds
- Bathrooms
- 2 baths
- ADU type
- Detached
- Construction type
- Stick built
- Plan fee
- $0
- Estimated cost
- Not listed in source
- Last checked
- Aug 13, 2026
Plan notes
Notes
- Foundation notes
- Not listed in source
- Utility notes
- Not listed in source
- Energy notes
- Not listed in source
- Accessibility notes
- Not listed in source
- Permit fee notes
- Plan cost does not include plan check, permit, impact, utility, or professional fees.
- Cost notes
- Not listed in source
- Additional notes
- Not listed in source
Source and evidence
Cathedral City ADU / pre-approved-plan information
- Publisher
- City of Cathedral City
- Source type
- Plan catalog
- Reliability
- Official city/county/state government source (5/5)
- Last checked
- Aug 13, 2026
- Accessed
- Aug 13, 2026
Accepted-in locations
Accepted Locations
1 accepted location