Plan record

Abodu Two

Abodu Two is a pre-approved detached ADU plan from Abodu. The public source lists it as 610 sq ft, 2 beds, and 1 bath. It originated in the Berkeley, Alameda County, California, USA program. This directory currently shows acceptance in Berkeley, Alameda County, California, USA. Source context comes from City of Berkeley (hosted by Community Planning Collaborative / ADU Accelerator), last checked May 4, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.

Source-backed summary

What public sources list

Abodu Two is a pre-approved detached ADU plan from Abodu. The public source lists it as 610 sq ft, 2 beds, and 1 bath. It originated in the Berkeley, Alameda County, California, USA program. This directory currently shows acceptance in Berkeley, Alameda County, California, USA. Source context comes from City of Berkeley (hosted by Community Planning Collaborative / ADU Accelerator), last checked May 4, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.

Provider record
Abodu

Details

Plan facts

Plan identifier
a0AHp000014OmjCMAS
Provider
Abodu
Accepted locations
Status
Pre-approved
Size
610 sq ft
Bedrooms
2 beds
Bathrooms
1 bath
ADU type
Detached
Construction type
Prefab
Plan fee
Not listed in source
Estimated cost
$312,800 to $352,500
Last checked
May 4, 2026

Plan notes

Notes

Foundation notes
Not listed in source
Utility notes
Not listed in source
Energy notes
All-electric; Solar-ready
Accessibility notes
Accessibility features
Permit fee notes
Pre-approved designs receive 50% reduced building plan check fee per City of Berkeley.
Cost notes
Base $312,800 inclusive of unit, delivery, permitting, and standard site work.
Additional notes
HCD pre-approval. Two 10'x14' bedrooms. Full-size appliances. WUI compliant. Turnkey.

Source and evidence

City of Berkeley ADU Plans Gallery

Official city source
Publisher
City of Berkeley (hosted by Community Planning Collaborative / ADU Accelerator)
Source type
Plan catalog
Reliability
Official city/county/state government source (5/5)
Last checked
May 4, 2026
Accessed
May 4, 2026

Accepted-in locations

Accepted Locations

1 accepted location