- Origin program
- Menifee, Riverside County, California, USA
- Source
- Permit-Ready ADU Application Packet
- Last checked
- Aug 11, 2026
Plan record
3 Bedroom Plan B
3 Bedroom Plan B is a pre-approved detached ADU plan from Design Path Studio. The public source lists it as 988 sq ft and 3 beds; bathroom count is not listed. It originated in the Menifee, Riverside County, California, USA program. This directory currently shows acceptance in Menifee, Riverside County, California, USA. Source context comes from City of Menifee, last checked Aug 11, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.
Source-backed summary
What public sources list
3 Bedroom Plan B is a pre-approved detached ADU plan from Design Path Studio. The public source lists it as 988 sq ft and 3 beds; bathroom count is not listed. It originated in the Menifee, Riverside County, California, USA program. This directory currently shows acceptance in Menifee, Riverside County, California, USA. Source context comes from City of Menifee, last checked Aug 11, 2026. Use the linked provider, location, and source records to verify current acceptance before relying on the plan.
- Provider record
- Design Path Studio
- Origin program
- Menifee, Riverside County, California, USA
- Accepted location pages
Details
Plan facts
- Plan identifier
- 3B
- Provider
- Design Path Studio
- Origin location
- Menifee, Riverside County, California, USA
- Accepted locations
-
- Menifee, Riverside County, California, USA (Accepted)
- Status
- Pre-approved
- Size
- 988 sq ft
- Bedrooms
- 3 beds
- Bathrooms
- Not listed in source
- ADU type
- Detached
- Construction type
- Not listed in source
- Plan fee
- $0
- Estimated cost
- Not listed in source
- Last checked
- Aug 11, 2026
Plan notes
Notes
- Foundation notes
- Not listed in source
- Utility notes
- Not listed in source
- Energy notes
- Not listed in source
- Accessibility notes
- Not listed in source
- Permit fee notes
- Packet illustration: approximately $2,313; verify current fees.
- Cost notes
- Not listed in source
- Additional notes
- Not listed in source
Source and evidence
Permit-Ready ADU Application Packet
- Publisher
- City of Menifee
- Source type
- Government PDF
- Reliability
- Official government PDF (4/5)
- Last checked
- Aug 11, 2026
- Accessed
- Aug 11, 2026
Accepted-in locations
Accepted Locations
1 accepted location