City program

Pre-Approved ADU Plans in New Shoreham town, Rhode Island

Browse official and accepted pre-approved ADU plans for New Shoreham town, Rhode Island. Compare plan size, bedrooms, providers, approval status, official source links, permit requirements, and fees.

Program status: source-backed listings Last checked Oct 29, 2026

Program Overview

This New Shoreham town page summarizes source-backed pre-approved ADU plan listings for New Shoreham town, Rhode Island, using official records tied to Town of New Shoreham, Town of New Shoreham Planning Board, Town of New Shoreham via General Code, and others. The current public dataset lists 0 accepted plans from 0 providers; provider names are Not listed in source. The accepted listings are tied to the local New Shoreham town program. Plan records cover plan sizes Not listed in source and bedroom counts Not listed in source where those fields were listed by the source.

Permit and fee context is kept separate from plan acceptance. The public dataset includes 4 permit requirement records and 5 fee records for New Shoreham town. Permit requirement records include EAP building application and preapproved design, EAP wastewater and water documentation, and others. Fee records include Residential building permit valuation tiers, Residential plan review, and others. When a source did not publish a value, the page keeps that field as Not listed in source instead of filling a blank.

Use these listings as a starting point for matching a plan to a property. Source links, checked dates, acceptance notes, and provider records are shown so you can verify whether a plan remains accepted locally, what site-specific review remains, and whether local fees, plan licensing, or provider terms apply. A listing in this directory does not guarantee permit approval for a specific parcel.

Summary

Location
New Shoreham town, Washington County, Rhode Island, USA
Accepted plans
0 accepted plans
Providers
0 providers
Origin programs
0 programs
Plan size range
Not listed in source
Permit sources
8 sources

How to use this page

  1. Pick a plan size and bedroom count.
  2. Check whether the plan originated locally or is accepted from another city/county program.
  3. Open the official source.
  4. Confirm current status with the local building department.
  5. Ask the provider what site-specific work, plan licensing, engineering, and utility review are still required.

Accepted Plans

0 plans

No accepted plans listed

This location has no accepted plan records in the current public dataset.

Permit Requirements

4 requirements

Section 513D3 EAP if currently available

EAP building application and preapproved design

Government PDF

The documented EAP requires building-official review and Planning Board preapproved plans; plans are held by the Zoning Official and obtainable on request.

Last checked
Oct 29, 2026
Notes
PDF page 29; formal framework corroborated by code/agenda. Current operation and available designs unresolved.

Town building department regulated work

Ordinary building and occupancy review

Official source

Town examines construction documents, issues construction permits, inspects work and issues occupancy certificates.

Last checked
Oct 29, 2026
Notes
Preapproval framework does not guarantee parcel permit issuance or waive technical/site review.

Fees

5 fee records

Residential building permits

Residential building permit valuation tiers

Government PDF

Per $1,000 valuation: $0–$50,000 $14 (minimum $75); $50,001–$100,000 $13; $100,001–$500,000 $12; $500,001–$1,000,000 $11; $1,000,001+ $10.

Last checked
Oct 29, 2026
Notes
PDF page 3, visually read; no project valuation or total calculated; marginal versus total-tier calculation must be confirmed.

Residential plan review

Residential plan review

Government PDF

Valuation through $1,000,000: 15% of building permit fee, minimum $100; $1,000,001 and above: 20% of building permit fee.

Last checked
Oct 29, 2026
Notes
PDF page 3; separate from plan purchase and other review categories.

Permit fees subject to state assessment

State code commission assessment

Government PDF

Additional 3% for July 1, 2026 through June 30, 2029, per published schedule.

Last checked
Oct 29, 2026
Notes
PDF page 3; historical tiers retained in source but current date falls in 3% period. Total remains NULL.

Special use applications if required

Special-use permit application

Government PDF

$400.00

Last checked
Oct 29, 2026
Notes
PDF page 23; documented EAP may remove special-use step when its conditions are met. Other review charges may remain.

Official Sources

8 sources

New Shoreham town ADU FAQ

6 answers

Does New Shoreham town have accepted or pre-approved ADU plans in this directory?

Not in the current export. This New Shoreham town, Rhode Island page is supported, but it does not list accepted or pre-approved ADU plan records yet.

What ADU plan sizes are listed for New Shoreham town?

No New Shoreham town plan size range is available because the current export does not include accepted plan records for this city.

Where do the New Shoreham town ADU plan records come from?

They are tied to 8 official sources in this page's source set, including Town of New Shoreham, Town of New Shoreham Planning Board, and Town of New Shoreham via General Code. Each plan, fee, and permit note should still be checked against the linked official source before use.

Can Washington County or nearby city ADU plans be used in New Shoreham town?

The current export has no accepted plan records for New Shoreham town. Treat Washington County or nearby city plans as unavailable in New Shoreham town unless an official New Shoreham town source says they are accepted.

Do pre-approved ADU plans guarantee permits in New Shoreham town?

No. A source-backed accepted plan can reduce plan review work, but New Shoreham town can still require site-specific review, zoning checks, fees, utility coordination, and current code compliance. This page lists 4 permit requirements to help flag items to verify with the local building department.

Are New Shoreham town ADU permit fees and requirements listed?

This page includes 5 fee records and 4 permit requirements for New Shoreham town. These are source-backed summaries, not a final permit quote or approval checklist.